gapilot vans RV7 quick build kit
My Great Lakes 2T-1A-2 Rebuild Diary 2007.

31/01-November-2007. Working on the centre section. Reassembling centre section. Refitted new front ribs. Fitting the centre section ply mod.


Here is this evenings progress:


New front ribs.
All assembled, I made some measurements to check it's square. It is, so very pleased.
After checking it is square I tigntened the tank brackets and rechecked. The new front ribs look nice.
Holes in ribs for fabric rivets.
The ply panel has ribs fitted and these are touching the front ribs.
As you can see from this picture the front ribs go past the front spar and are touching the ribs on the underside of the ply. So I filed them down to fit.
A quick check where the inspection panel need to be fitted.
Drain hole in fabric - I will need one in the ply.
Other inspection hole.
Not convinced this is correct, need to do some research.
Varnished the underside of the ply as I don't intend to remove the tank and varnish after fitting.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.