gapilot vans RV7 quick build kit
My Great Lakes 2T-1A-2 Rebuild Diary 2007.

09-November-2007. Working on the top side of the centre section - the over fuel tank ribs.


Here is this evenings progress:


The over fuel tank ribs are riveted to the front and rear ribs.
This is the fuel tank sender inspection panel - IT IS UPSIDE DOWN IN THIS PICTURE.
I have now riveted the inner end rib to the spar end brackets and trial fitted the outer ribs to check everything is aligned properly.
Over fuel tank rib to front rib.
Trial fitting to check alignment of the trailing edge. All is okay so I will rivet them up after drilling and fitting the over tank ribs.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.