gapilot vans RV7 quick build kit
My Great Lakes 2T-1A-2 Rebuild Diary 2007.

27-November-2007. Tidied the the second wing - Lower Left.

Here is this evenings progress:


Lower Left wing ready for inspection.
Getting smart with workshop space. I will be storing the wings in the roof.
Cleaned ans re-varnish the inside of the wing walk area.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.