gapilot vans RV7 quick build kit
My Great Lakes 2T-1A-2 Rebuild Diary 2007.

10-October-2007. Drilled (small) bolt holes to attach rear ribs to spar. Also drilled holes in rear ribs to attach trailing edge. Attached outer ribs to spar mounts. I am now going to mock up the centre section with the new spar - also fit tank. To ensure all is correct before drilling any more holes. Will also trial fit the centre section mod.

I have also created a HELP ME page on this site for areas/parts etc that I don't know what fits. Please have a look especially if you have a Great Lakes 2T-1A-2.
Here is this evenings progress:


Assembling the center section to check alignment.
I reassembled the original spar with the replacement rear ribs.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.