My Great Lakes 2T-1A-2 Rebuild Diary 2007. 11/12-October-2007. Trial fitted tank to centre section.
Started to look at forward ribs and discovered the replacement ribs
are a mirror of the original.
Fitted the fuel tank to check all is correct as I have replaced the
rear spar.
|
|
Tank brackets
I started to look at the replacement forward ribs and discovered
the replacements are a morror of the original..
|
|
The rib must align with the original - so the rib over the tank aligns with the rear rib.
So I have two choices a) drill another hole in the spar for the rib to spar bolt. b) or rivet another flange on the other side of the rib. |
|
Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it. |