My Great Lakes 2T-1A-2 Rebuild Diary 2007.

29-October-2007. Working on the centre section. Dismantled the centre section to finish drilling rear spar bolts and to varnish. Oscar came to help.......


Here is this evenings progress:


The rear spar with first layer of varnish and rear ribs fitted.
These are the fill in strips between the ribs for the ply panel to be glued to. They will be glued to the top of the rear spar, then the ply glued along with some screws..
My Great Lakes technical consultant - Oscar. Came to inspect the quality of my wood shavings.
The last spar bracket bolt goes from top to bottom. I had left drilling this as I didn't have a drill long enough.
This is a difficult hole to drill.
As you can see from the bolt, the hole has to be acurate.
The top of the spar is at an angle so needs a packing piece.
Last part cut and bolt in place.
My technical consultant taking a rest - it was such hard work.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.