gapilot vans RV7 quick build kit
My Great Lakes 2T-1A-2 Rebuild Diary 2007.

20-September-2007. Completed attaching fabric to L/H elevator, started covering R/H elevator.

I have also created a HELP ME page on this site for areas/parts etc that I don't know what fits. Please have a look especially if you have a Great Lakes 2T-1A-2.
Here is this evenings progress:

Fitting fabric around the elevator mount.
I am using Ceconite.
Rechecking the calibration of the iron.
Completed attaching the fabric to the L/H elevator.
Next R/H elevator.
Paperwork, evething must have the proper paperwork. So glue and fabric batch is noted for each component.
R/H elevator.
  Copyright © 2007 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not PFA, FAA or CAA. Please check all information is correct before you act upon it.