05/06-March-2008. Centre section & L/H Lower wing.
Finished work on the centre section. Started working on the L/H lower wing. The spars are okay. I just need to refit the spar end mounts. Check all the drag wires etc.


I had to open the stock edge to fit round the centre part of the trailing edge.
Got the L/H wing out this evening. It has been ispected and just needs the wing mount fittings re-fitting.

Oscar came to view the wing and check it over........
A thorough inspection.......
All looks okay.
The wing walk area.
.
The wires need to be secured properly.
Wing spar fittings. I will clean the old paint off before refitting.
.
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.