My Great Lakes 2T-1A-2 Rebuild Diary 2008.

31-March-2008. Fabric covering R/H Upper wing.
This evening ftted inderside tapes and worked on inspection panels.


Rear upper top wing root underside inspection and spar bolt panel.
Front underside spar fixing panel.
Forward mid upper.
I had to cut through the fabric!! .
Rear mid cover.
I installed all the screws in the cover attachment which is bonded to the fabric and screwed to the rib. I have fitted every screw as I don't want to find out there is a problem - with alignment - after the wing is painted.
The inspection panel to fabric attachment - this is glued to the fabric then covered with a fabric patch.
Front panel screwed in place.
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.