My Great Lakes 2T-1A-2 Rebuild Diary 2008.

01/02-Sep-2008. Fabric covering.
Fitting fabric to the left hand side of the fuselarge.


Taping the fuse.
Anti-chafe tape.
Wiring for the rear light.
Anti-chafe tape to the luggage box.
Fabric draped over.
HS and elevator attachments through the fabric.
Foot step.
Fabric fitted to VS.
Fabric joint between left and right hand side.
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.