My Great Lakes 2T-1A-2 Rebuild Diary 2008.

22 to 25-Sep-2008. Fabric covering.
Sprayed Rand-o-proof in the fuselarge, worked on ailerons - covering and fitting tapes.


Masked the fuselarge and sprayed two layer of Rand-o-proof.
Pleased with finish, although I do have some marks around the foot step.
I finished and tidied the rear underside around the oil drain and tail wheel spring. I was going to remove the tail spring but could not get it out very easily. So left it in place.
Fuselarge sprayed next the ailerons.
  Copyright © 2008 GreatLakes2T .co.uk All rights reserved. All pictures are property of GreatLakes2T (unless noted) please do not reproduce. For more information contact webmaster [at] greatlakes2t .co.uk This site is NOT the official Great Lakes Inc site. The contents of this site are the opinion of the author, not LAA, FAA or CAA. Please check all information is correct before you act upon it.